Glenfield, Birkenhead, Beachaven Builders

Bathroom Renovations

Full bathroom renovations 

We specialise in full bathroom redesign.
Have your project run on time, on budget – as per our quotations.

Design & Build

Bathrooms

If carried out correctly, bathroom renovations will always be worth the money spent, and more. Statistics prove that bathrooms and kitchens sell houses. These rooms warrant that extra outlay in budget; they are proven to add a healthy return on your investment.

Read More About Our process View Bathroom Renovation Gallery

Bathroom Design, Fixtures & Fittings

First

Bathroom Designing Stage

First we listen to your requirements for the bathroom or renovation. We offer you bathroom ideas and good, constructive advice on the layout of your bathroom to effectively utilisie the space . Your bathroom design and layout is hugely important so it is  functional and practical and improves the flow, style, feel and value of your home and enhances your investment. With our expertise and experience in bathroom renovations, we can help you obtain the best results.

Build once and build right with Nicol Renovations. Call us on 09 442 5612 or 021 723 682 for great bathroom ideas.

Second

Bathroom Fixtures & Fittings

Bathroom renovations. Clients in most cases  select their own bathroom fixtures, fittings and tapware. This allows you to purchase within your budget: you can spend at the high end, the medium end or the low end, which we do not recommend.

This  room  is important to get right so we always recommend quality fixtures and fittings.

We require all fixtures and fittings to be onsite prior to renovation and building work commencing.

bathroom remodel
Third

Bathroom Tiles

Clients will select bathroom tiles of their  choice . We will supply you with the quantities required so all you have to do is choose the colour and style that suits your taste and budget.

Phone Rod on 09 442 5612 after hours or 021 723 682 today for more information on bathroom makeovers and to book an obligation free consultation.

Bathroom Renovation
Fourth

Project Planning

Nicol Renovations Ltd supply all the building sub-contractors required and project manage the whole renovation process from start to finish. Good planning is hugely critical as bathrooms are generally smaller rooms and several different qualified tradesmen need to work in the same area.

It is not advisable or good practice to have to many tradesman in a confined space trying to achieve their work at once.. With good organisation of those tradesmen, we will have your job running efficiently  through till completion and your new bathroom will be up and running as quickly as possible.

Our project manager will have regular contact right through until the completion of your bathroom renovation keeping you  informed of what is happening and when.

If any unforeseen circumstances arise, we will contact you immediately  to discuss your options and our recommendations; we will work with you to keep your bathroom renovation moving forward smoothly.

Fifth

Removal & Construction

Firstly we remove all bathroom fixtures and fittings, wall linings, ceiling lining if required, and if the flooring is particle board, we replace it with compressed sheet or tanalised H3.2 plywood. We take your bathroom back to a bare shell.

If we replace the particle board flooring, then existing floor joists will be nogged at .400ctrs to form a grid pattern. This is because timber moves with dampness, swelling and then shrinking as it dries.

By forming this grid, the H3.2 tanilised plywood or compressed sheet can be glued and screwed to these joists and nogs to form a rigid brace. The reduction in movement will in turn help prevent the waterproof membrane applied to the floor from splitting or cracking through movement. This ensures the waterproofing does its job.

Solid tongue and groove flooring as you would see in villas and bungalows can still be used but will require a minimum of three coats of polyurethane applied as a waterproof membrane.

After new preline bathroom plumbing and electrical work  has been finished we  re-line the walls and ceilings. We only use aqualine gibboard or villaboard for wall linings and aqualine gibboard for ceilings in all wet rooms.

Next to follow is waterproofing. We offer a 5 year workmanship warranty and a 15 year product warranty.

Gib-stopping is then completed. This prepares the surfaces for painting and tiling etc.

A tiler is then engaged and tiling is installed. If underfloor heating is required this is carried out prior to tiling. Underfloor heating comes with a lifetime undertile warranty and a 5 year warranty on thermostat controls.

After  tiling is finished, the plumber and electrician can come back and finish the final fit of fixtures and fittings.

Glass shower doors or screens can be installed. If a cubicle shower with an acrylic liner is being used, these can be installed prior to tiling.